What is the production process?

The cross coupling cable protectors are manufactured by all steel casting part ,and machined and assembled and function tested.

How to get the quotation of cross coupling cable clamps?

Please specify the coupling type, coupling OD ,Cable size and Casing size and quantity, and quotation and solution plan will be finished in 24 hours.

Minimum Production Quantity?

No minimum production quantity requirement, since we have botch automatic shell making line and manual production line, and can process the production of high quantity and low quantity for the cross coupling cable protectors in the same time, and insure fast delivery.

Samples Making Lead Time?

If without existing tooling for this type of cross coupling cable protector, 15 days will taken for samples making(Tooling making 7 days + Casting Production 5 days + Heat Treatment 1 day + Machining and Assembly 1 day + Inspection 1day).

If with existing tooling, 7 days will taken for samples making (Casting Production 5 days + Heat Treatment 1 day + Machining and Assembly 1 day + Inspection 1day).

Lead time for Batch production of all cast cross coupling cable protectors?

20 days for quantity less than 500 pcs.
25 days for quantity 500 pcs to 1000 pcs.
30 days for quantity 1000 to 2000 pcs.
40 days for quantity 2000 pcs to 5000 pcs.

Delivery

FOB NINGBO / EX-WORKS / CIF designated Port are all available.

Quality Assurance

Material Certificate / Nondestructive Examination Report / Function Test Report of all cast cross coupling cable clamps can be provided.